INCINERATOR DIESEL DRIVEN – Waste Incinerators

INSULATION.Limiting Regular solution limit 1000 amounts C.Waste kind: MEDICAL CARE WASTE Small Capacity: 50Kg/Hour set tons.Thickness 25mm THROUGHPUT.50kg/hour at a small calorific well worth of 4,000 kcal/kg and also a regular mass thickness of 120kg/MCubed for regular waste and 160kg/MCubed for healthcare waste.

Read More

medical small incinerator – Waste Incinerators

Dimensions: World standard: 0.83m(I) x 1.0m(w) x 1.4m(h) Burning efficacy: >98% china double chamber incinerator Features: ?     Waste type and burn rate: Designed specifically for use by poultry farmers, game-keepers and for pet cremation. The incinerator will burn up to 50 kg of waste per hour. ?     Construction: solid steel welded fabrication composed of sheet…

Read More

HOSPITAL WASTE INCINERATOR 50-60KG / HR – Waste Incinerators

The Incinerator (waste management system ) is a turn-key project which will compromise a hospital grade incinerator, allied accessories for proper disposal of hospital solid waste material and imputed human organs.  The incinerator shall also be suitable for plastic, paper, textile and rubber dry and wet infectious waste of the hospital. The unit shall be of high performance to  be opened continuously for at least 08 C 12 hours daily. The Primary source of fuel will be natural gas (must be compatible with LPG as backup source with vaporizers) combustion with smokeless emissions. For ensuring the clean environment, it should strictly comply with EPA standards having EIA certifications  The incinerator system should be based on at least  design and recently manufactured having following specifications:- (1)    Burning Capacity. Continuous feeding and burning capacity of 50-60 kg/ hour or better having volume of 500 liters or more. YES, 50-100kgs/hr. 560 Liters (2)    Construction (a)    Primary Chamber i.                     Rectangular shape dual chamber construction YES ii.                   The feeding door should be in accordance to load size and should be front loaded or side loaded (Manual/ Automatic). YES iii.                  The steel sheet shall be at least 6-8mm thick & 10-12mm or more from front with Heat resistant paint. YES. 8MM MAINBODY. 15MM PARTIAL STRENGTHENING iv.                 The internal surface of the incinerator shall be lined with non-cracking refractory bricks (high content of Aluminum or  suitable material) along with isolation bricks to withstand a temperature of 1400°C backed by thermal insulation. HOT FACE, HIGH ALUMINUM FIREBRICK 55% OF AL203,1750°C GRADE. CODE FACE, HIGH RATE REFRACTORY CERAMIC FIBER, 1050°C GRADE. (b)   Post Chamber. Post combustion chamber is lined with high thermal insulating materials with a thickness of 150mm or more of refractory bricks and 85mm of insulator. Hot Face, 180mm, High aluminum firebrick 55% of Al203,1750°C Grade. Code Face, 100mm, High Rate Refractory Ceramic Fiber, 1050°C Grade. (c)    Chimney i.                     Chimney should be made of stainless steel flanged section. YES ii.                   Height of chimney should be 8-12 meters YES – 10 METERS iii.                  Chimney should be fitted with sampling port for the collection and measuring of gas samples. YES (3)    Technical Specifications (a)    Primary Chamber (Combustion) i.                     Blower centrifugal fan(s) shall be provided to inject air to burn the waste and gases in combustion chamber. YES ii.                   Automatic electronically controlled air distribution and regulation system. YES iii.                  The temperature should not be less than 850°C. AVE.900C iv.                 A see through window with protection flap for inspection of burners flame should be provided. YES v.                   Thermocouple/sensors to monitor the temperature of the primary chamber. YES vi.                 Two medium electricity operated natural gas burners or one large with the provision to operate in standby LPG fuel with burning power not less than 250 kw YES (b)   Secondary Chamber (Post Combustion) i.                     The post combustion chamber for flue gases with retention time of 1 to 2  seconds to burn further for ensuring smokeless exhaust emissions. YES ii.                   Automatic electronically controlled air distribution and regulation system. YES iii.                  The temperature should not be less than 850°C or better. AVE.1100C iv.                 Two medium electrically operated natural gas or more large with the provision to operate on standby LPG fuel. YES v.                   Thermocouples/sensors to monitor the temperature of the secondary chamber. YES (4)    Burners (a)    Combustion and post combustion chambers with electrically operated burners suitable for natural gas operation as well as standby LPG fuel . YES (b)   Automatic closing of burners with opening of respective chambers door….

Read More

Waste Incinerator HICLOVER TS30(PLC) – Waste Incinerators

Incinerator Items/Model HICLOVER TS30(PLC) Burn Rate (Average) 30-50 kg/hour Feed Capacity(Average) 60kg/feeding Control Mode PLC Automatic Primary Combustion Chamber 330L Internal Dimensions 75x75x60cm Secondary Chamber 180L Smoke Filter Chamber Yes Feed Mode Manual Voltage 220V 2P Power 0.5Kw Burner Type Italy Brand Oil Consumption (kg/hour) 12 N.Gas Consumption (m3n/hour) 9.8–20 Temperature Monitor Yes Temperature Thermometer…

Read More

incinerator 500kg per hr – Waste Incinerators

? Opening Doors – the closed and fixation automated system, that are handled remotely by the operator. ? Designed to operate in long mode and quick Action ( Quick Start EP – I) ? Fully mobile – mounted on wheeled chassis Even through the operation. Incinerators must be provided As standard equipment a particular truck…

Read More

TS1000 Average 1000kg/hour Solid Waste Incineration – Waste Incinerators

Items/Model TS1000 Picture   Principle Solid Waste Incineration Treatment Burn Rate Average 1000kg/hour Feed Capacity Average 6000kg/feeding Control Mode PLC(Programmable Logic Controller Incinerator) Combustion Chamber 4800Liter Internal Dimensions 400*120*100 cm Secondary Chamber 1000Liter Feed Mode Manual/Forklift Voltage 220V/380V Power 8.0Kw Oil Consumption (kg/hour) Average 67(DO) Gas Consumption (m3/hour) *** Temperature Monitor Digital Display Temperature HICLOVER Yes Oil…

Read More

pet crematorium equipment – Waste Incinerators

Finally, steam to  the coat should shut off, the unloading door is to be opened Then the shaft and mixing arms are reversed to behave as unloading mechanism and should scoop the waste fragments out of the unloading door, onto a conveyor belt or directly into a waste container. The vessel should now be ready…

Read More

hospital incinerator manufacturers – Waste Incinerators

SECTION V   TECHNICAL SPECIFICATIONS OF THE INCINERATOR     The plant has to have four different sections that demonstrate three fundamentals of turbulence, residence time and temperature retention. The regulated sections may include but not limited to:   Overall plant layout Feed chamber/charging Primary combustion chamber Particulate scrubbers Acid gas The stack/chimney. Minimum capacity…

Read More

medical incinerator design – Waste Incinerators

It’s anticipated that the Bidder will cooperate closely with PATH and target Hospitals for the new waste management building/area and will make available all needed technical information, drawings, etc.,   The following waste streams shall be treated in the new HCW treatment center(s):   Infectious waste   Sharps waste   Pathological waste   Pharmaceutical waste…

Read More

Animal cremation equipment rates – Waste Incinerators

    The following requirements are to be considered as an essential part of the technical specifications for each equipment type.   The system offered shall be made to operate normally under the conditions of different areas in Kenya. These conditions may include but not limited to power supply, temperature, humidity, and other climatic conditions….

Read More